What goes into a knock down and rebuild?
We assess whether rebuilding is better value than extending and renovating, prepare the planning application for the replacement dwelling, manage the demolition notice and asbestos survey, then build the new home. The process runs much like a new build once the old house is cleared.
- Feasibility: rebuild versus extend and renovate
- Demolition and site clearance
- New foundations, structure and full fit-out
How much does a knock down and rebuild cost in Prescot?
Guide prices for knock down and rebuild, including VAT where it applies. Your fixed price is confirmed in writing after the survey.
| Knock down and rebuild | Guide price |
|---|---|
| Demolition and site clearance (total) | £15,000 to £35,000 |
| Rebuild, standard specification (per m²) | £2,100 to £2,600 per m² |
| Rebuild, good specification (per m²) | £2,600 to £3,100 per m² |
| Rebuild, high specification (per m²) | £3,100 to £3,700 per m² |
Do you need permission for a knock down and rebuild in Prescot?
Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.
This needs full planning permission from the council. We prepare the drawings and supporting documents, submit the application and respond to the planning officer.
What should I think about before starting?
- A replacement dwelling is usually zero-rated for VAT where the old house is demolished completely to ground level.
- Planning policy on replacement dwellings varies, especially in green belt and countryside.
What are the steps?
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
Your questions answered
How long does it take?
Around 36 to 60 weeks including demolition.
What happens about asbestos?
An asbestos survey is done before demolition and any asbestos is removed safely first.
Who deals with the council for a project in Prescot?
We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.
Other towns nearby
- Knock down and rebuild in Huyton
- Knock down and rebuild in St Helens
- Knock down and rebuild in Kirkby
- Knock down and rebuild in Widnes
Learn more about knock down and rebuild, or see every project we cover in Prescot.