Knock down and rebuild · Radcliffe

Knock down and rebuild in Radcliffe

From the first site visit to the final building control sign-off, we manage knock down and rebuild in Radcliffe so you only have one company to deal with.

Covering Radcliffe

Our coverage around Radcliffe (M26) also includes Whitefield (1 miles to the south-east) and Prestwich.

Homes in the North West

The North West has long rows of Victorian terraced houses in its towns and cities, alongside inter-war semis and post-war estates, so rear extensions, dormer lofts and kitchen extensions are common projects.

What is a knock down and rebuild?

Knock down and rebuild means demolishing an existing house and building a new one in its place, often a bungalow or poorly built post-war house replaced by a larger, more efficient home. Because the new house counts as a new dwelling, the build is usually zero-rated for VAT.

  • Planning application for the replacement dwelling
  • New foundations, structure and full fit-out
  • Reconnection of services and landscaping

What will a knock down and rebuild cost?

Use these ranges to budget for knock down and rebuild; the survey turns them into a fixed price for the agreed specification.

Knock down and rebuildGuide price
Demolition and site clearance (total)£15,000 to £35,000
Rebuild, standard specification (per m²)£2,100 to £2,600 per m²
Rebuild, good specification (per m²)£2,600 to £3,100 per m²
Rebuild, high specification (per m²)£3,100 to £3,700 per m²

Do you need permission for a knock down and rebuild in Radcliffe?

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

This needs full planning permission from the council. We prepare the drawings and supporting documents, submit the application and respond to the planning officer.

What should I think about before starting?

  • A replacement dwelling is usually zero-rated for VAT where the old house is demolished completely to ground level.
  • Asbestos is common in post-war houses and must be removed by licensed contractors where required.

What happens after I enquire?

  1. Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
  2. Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
  3. Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

What people ask before starting

Is it cheaper to knock down and rebuild or renovate?

It depends on the existing house. Where a house needs major structural work and a large extension, rebuilding can be similar cost and gives a better result. We compare both at feasibility.

What happens about asbestos?

An asbestos survey is done before demolition and any asbestos is removed safely first.

Can you visit a house in Radcliffe to quote?

Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.

Knock down and rebuild in nearby towns

Learn more about knock down and rebuild, or see every project we cover in Radcliffe.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote