Knock down and rebuild · Rutland

Knock down and rebuild in Rutland

Knock down and rebuild across Rutland, designed and built by SK Residential under one contract. We handle the survey, drawings, approvals and construction.

Covering Rutland

We cover Rutland, including Oakham and Uppingham.

Homes in the East Midlands

The East Midlands combines red-brick terraces in the cities with a lot of post-war and modern estate housing, so rear extensions, garage conversions and loft conversions are all common.

What do you get with a knock down and rebuild?

We assess whether rebuilding is better value than extending and renovating, prepare the planning application for the replacement dwelling, manage the demolition notice and asbestos survey, then build the new home. The process runs much like a new build once the old house is cleared.

  • Planning application for the replacement dwelling
  • Asbestos survey, demolition notice and service disconnections
  • Reconnection of services and landscaping

How much does a knock down and rebuild cost in Rutland?

Typical ranges for knock down and rebuild. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.

Knock down and rebuildGuide price
Demolition and site clearance (total)£15,000 to £35,000
Rebuild, standard specification (per m²)£2,100 to £2,600 per m²
Rebuild, good specification (per m²)£2,600 to £3,100 per m²
Rebuild, high specification (per m²)£3,100 to £3,700 per m²

Do you need permission for a knock down and rebuild in Rutland?

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

This needs full planning permission from the council.

What should I think about before starting?

  • You will need somewhere to live for most of a year.
  • Asbestos is common in post-war houses and must be removed by licensed contractors where required.

From first call to completion

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

Questions about a knock down and rebuild in Rutland

Is VAT charged on a knock down and rebuild?

Usually not on the new house, if the old one is demolished completely and the new building is a qualifying dwelling.

How long does it take?

Around 36 to 60 weeks including demolition.

How do I get a price for knock down and rebuild in Rutland?

Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.

Knock down and rebuild near Rutland

Learn more about knock down and rebuild, or see every project we cover in Rutland.