Knock down and rebuild · Southampton

Knock down and rebuild in Southampton

Knock down and rebuild for homes in Southampton and the surrounding parts of Hampshire, designed around your house and built by our teams under a single written contract.

Covering Southampton

Our coverage around Southampton (SO15) also includes Totton, Eastleigh and Fareham.

Homes in the South East

Housing across the South East mixes inter-war semis, post-war estates and older cottages in villages and market towns, so rear and side extensions, hip-to-gable lofts and garage conversions all come up regularly.

What does a knock down and rebuild involve?

Knock down and rebuild means demolishing an existing house and building a new one in its place, often a bungalow or poorly built post-war house replaced by a larger, more efficient home. Because the new house counts as a new dwelling, the build is usually zero-rated for VAT.

  • Feasibility: rebuild versus extend and renovate
  • Asbestos survey, demolition notice and service disconnections
  • New foundations, structure and full fit-out

How much does a knock down and rebuild cost in Southampton?

Use these ranges to budget for knock down and rebuild; the survey turns them into a fixed price for the agreed specification.

Knock down and rebuildGuide price
Demolition and site clearance (total)£15,000 to £35,000
Rebuild, standard specification (per m²)£2,100 to £2,600 per m²
Rebuild, good specification (per m²)£2,600 to £3,100 per m²
Rebuild, high specification (per m²)£3,100 to £3,700 per m²

What approvals does a knock down and rebuild need in England?

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

This needs full planning permission from the council.

What can affect a knock down and rebuild?

  • You will need somewhere to live for most of a year.
  • Planning policy on replacement dwellings varies, especially in green belt and countryside.

How does the project run?

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
  3. Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

Your questions answered

Is it cheaper to knock down and rebuild or renovate?

It depends on the existing house. Where a house needs major structural work and a large extension, rebuilding can be similar cost and gives a better result. We compare both at feasibility.

How long does it take?

Around 36 to 60 weeks including demolition.

Can you visit a house in Southampton to quote?

Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.

Knock down and rebuild in nearby towns

Learn more about knock down and rebuild, or see every project we cover in Southampton.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote