Knock down and rebuild · Sunderland

Knock down and rebuild in Sunderland

If you live in Sunderland and want knock down and rebuild, we can take the whole job off your hands, from measuring the house to handing over a finished room.

Covering Sunderland

Sunderland sits 10 miles south-east of Newcastle upon Tyne, with Seaham 5 miles to the south and Washington 5 miles to the west.

Homes in the North East

The North East has terraced housing including Tyneside flats, inter-war semis and post-war estates, so loft conversions, rear extensions and layout changes are popular ways to add space.

What do you get with a knock down and rebuild?

Knock down and rebuild means demolishing an existing house and building a new one in its place, often a bungalow or poorly built post-war house replaced by a larger, more efficient home. Because the new house counts as a new dwelling, the build is usually zero-rated for VAT.

  • Feasibility: rebuild versus extend and renovate
  • Asbestos survey, demolition notice and service disconnections
  • Reconnection of services and landscaping

How much should I budget for a knock down and rebuild?

Guide prices for knock down and rebuild, including VAT where it applies. Your fixed price is confirmed in writing after the survey.

Knock down and rebuildGuide price
Demolition and site clearance (total)£15,000 to £35,000
Rebuild, standard specification (per m²)£2,100 to £2,600 per m²
Rebuild, good specification (per m²)£2,600 to £3,100 per m²
Rebuild, high specification (per m²)£3,100 to £3,700 per m²

Planning and building rules in Sunderland

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

This needs full planning permission from the council. We prepare the drawings and supporting documents, submit the application and respond to the planning officer.

What should I think about before starting?

  • You will need somewhere to live for most of a year.
  • Planning policy on replacement dwellings varies, especially in green belt and countryside.

From first call to completion

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

Your questions answered

How long does it take?

Around 36 to 60 weeks including demolition.

What happens about asbestos?

An asbestos survey is done before demolition and any asbestos is removed safely first.

Do you work in Sunderland?

Yes. Sunderland is within our coverage for knock down and rebuild, along with nearby Seaham and Washington.

Knock down and rebuild in nearby towns

Learn more about knock down and rebuild, or see every project we cover in Sunderland.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote