What goes into a knock down and rebuild?
Knock down and rebuild means demolishing an existing house and building a new one in its place, often a bungalow or poorly built post-war house replaced by a larger, more efficient home. Because the new house counts as a new dwelling, the build is usually zero-rated for VAT.
- Planning application for the replacement dwelling
- Asbestos survey, demolition notice and service disconnections
- Reconnection of services and landscaping
How much does a knock down and rebuild cost in Swadlincote?
Typical ranges for knock down and rebuild. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.
| Knock down and rebuild | Guide price |
|---|---|
| Demolition and site clearance (total) | £15,000 to £35,000 |
| Rebuild, standard specification (per m²) | £2,100 to £2,600 per m² |
| Rebuild, good specification (per m²) | £2,600 to £3,100 per m² |
| Rebuild, high specification (per m²) | £3,100 to £3,700 per m² |
How is a knock down and rebuild approved in Swadlincote?
In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.
This needs full planning permission from the council. We prepare the drawings and supporting documents, submit the application and respond to the planning officer.
What should I think about before starting?
- A replacement dwelling is usually zero-rated for VAT where the old house is demolished completely to ground level.
- You will need somewhere to live for most of a year.
How does the project run?
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
Your questions answered
Do I need planning permission?
Yes, for the replacement dwelling.
How long does it take?
Around 36 to 60 weeks including demolition.
Do you work in Swadlincote?
Yes. Swadlincote is within our coverage for knock down and rebuild, along with nearby Burton upon Trent and Coalville.
Other towns nearby
- Knock down and rebuild in Burton upon Trent
- Knock down and rebuild in Coalville
- Knock down and rebuild in Derby
- Knock down and rebuild in Tamworth
Learn more about knock down and rebuild, or see every project we cover in Swadlincote.