Knock down and rebuild · Warwickshire

Knock down and rebuild in Warwickshire

Looking for knock down and rebuild in Warwickshire? We take projects from the first visit to the final sign-off, and confirm the price in writing first.

Covering Warwickshire

Our coverage across Warwickshire includes Nuneaton, Rugby, Leamington Spa and Warwick.

Homes in the West Midlands

Red-brick terraces and inter-war semis make up much of the housing in the West Midlands, which suits rear extensions, dormer lofts and hip-to-gable conversions, with more modern estates on the edges of the towns.

What does a knock down and rebuild involve?

We assess whether rebuilding is better value than extending and renovating, prepare the planning application for the replacement dwelling, manage the demolition notice and asbestos survey, then build the new home. The process runs much like a new build once the old house is cleared.

  • Planning application for the replacement dwelling
  • Demolition and site clearance
  • Reconnection of services and landscaping

What will a knock down and rebuild cost?

Use these ranges to budget for knock down and rebuild; the survey turns them into a fixed price for the agreed specification.

Knock down and rebuildGuide price
Demolition and site clearance (total)£15,000 to £35,000
Rebuild, standard specification (per m²)£2,100 to £2,600 per m²
Rebuild, good specification (per m²)£2,600 to £3,100 per m²
Rebuild, high specification (per m²)£3,100 to £3,700 per m²

What approvals does a knock down and rebuild need in England?

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

This needs full planning permission from the council. We prepare the drawings and supporting documents, submit the application and respond to the planning officer.

What should I think about before starting?

  • Planning policy on replacement dwellings varies, especially in green belt and countryside.
  • Asbestos is common in post-war houses and must be removed by licensed contractors where required.

From first call to completion

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
  3. Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

Your questions answered

How long does it take?

Around 36 to 60 weeks including demolition.

What happens about asbestos?

An asbestos survey is done before demolition and any asbestos is removed safely first.

Can you visit a house in Warwickshire to quote?

Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.

Other towns nearby

Learn more about knock down and rebuild, or see every project we cover in Warwickshire.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote