Loft conversions · Bicester

Loft conversions in Bicester

Homeowners in Bicester can get loft conversions from one company: the design, the paperwork and the building work sit with us rather than with three separate firms.

Covering Bicester

We work in Bicester (OX6, OX25, OX26) and the places around it, including Brackley, Buckingham and Oxford.

Homes in the South East

The South East has a lot of 1930s and post-war semi-detached housing, well suited to rear extensions and hip-to-gable loft conversions, alongside period properties in conservation areas that need a more careful design.

What do you get with a loft conversion?

We start with the head height. You need roughly 2.2 m or more from the top of the ceiling joists to the underside of the ridge for a conversion to work without raising the roof. From there we design the staircase position, the type of conversion and the en-suite, and manage the whole build including fire safety and building control.

  • Design drawings and structural calculations
  • Planning or lawful development certificate
  • Dormer or rooflights, insulation and plasterboard

What is the guide price for a loft conversion in Bicester?

Indicative costs for loft conversions. London and the South East usually sit towards the top of each range.

Loft conversionsGuide price incl. VAT
Rooflight conversion£30,000 to £45,000
Dormer conversion£50,000 to £90,000
Hip-to-gable with dormer£60,000 to £95,000
Mansard conversion£65,000 to £110,000

Planning and building rules in Bicester

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

In England many loft conversions are permitted development: the extra roof volume must stay within 40 m³ on a terraced house or 50 m³ on a semi or detached house, nothing can sit higher than the existing ridge, no dormer can face a road on the main elevation, and side windows must be obscure-glazed and non-opening below 1.7 m. Houses in conservation areas, National Parks and National Landscapes cannot use these roof-extension rights, so dormers there need planning permission (a rooflight-only conversion can still be permitted development), and flats always need permission.

What can affect a loft conversion?

  • Head height under the ridge decides whether a conversion is practical.
  • Fire safety rules can mean new fire doors on the floors below.

What are the steps?

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

Your questions answered

Does a loft conversion need planning permission?

In England many are permitted development, within 40 m³ of extra volume on a terrace or 50 m³ on a semi or detached house. Conservation areas and flats need permission.

How long does a loft conversion take?

Usually 6 to 14 weeks on site depending on the type.

How do I get a price for loft conversions in Bicester?

Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.

Also covering

Learn more about loft conversions, or see every project we cover in Bicester.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote