Loft conversions · Chester

Loft conversions in Chester

We take on loft conversions in Chester as a complete project: survey, drawings, planning or permitted development checks, building control and the construction itself.

Covering Chester

We work in Chester (CH1) and the places around it, including Hawarden, Deeside and Ellesmere Port.

Homes in the North West

Terraced housing is a defining feature of many North West towns, which brings party walls and narrow access into most projects, with more space to extend on suburban semis.

What do you get with a loft conversion?

We start with the head height. You need roughly 2.2 m or more from the top of the ceiling joists to the underside of the ridge for a conversion to work without raising the roof. From there we design the staircase position, the type of conversion and the en-suite, and manage the whole build including fire safety and building control.

  • Loft survey and head-height check
  • Design drawings and structural calculations
  • Dormer or rooflights, insulation and plasterboard

How much should I budget for a loft conversion?

Indicative costs for loft conversions. London and the South East usually sit towards the top of each range.

Loft conversionsGuide price incl. VAT
Rooflight conversion£30,000 to £45,000
Dormer conversion£50,000 to £90,000
Hip-to-gable with dormer£60,000 to £95,000
Mansard conversion£65,000 to £110,000

How is a loft conversion approved in Chester?

In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.

In England many loft conversions are permitted development: the extra roof volume must stay within 40 m³ on a terraced house or 50 m³ on a semi or detached house, nothing can sit higher than the existing ridge, no dormer can face a road on the main elevation, and side windows must be obscure-glazed and non-opening below 1.7 m.

What can change the price or programme?

  • Head height under the ridge decides whether a conversion is practical.
  • Fire safety rules can mean new fire doors on the floors below.

What are the steps?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

Your questions answered

Does a loft conversion need planning permission?

In England many are permitted development, within 40 m³ of extra volume on a terrace or 50 m³ on a semi or detached house. Conservation areas and flats need permission.

How long does a loft conversion take?

Usually 6 to 14 weeks on site depending on the type.

How do I get a price for loft conversions in Chester?

Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.

Also covering

Learn more about loft conversions, or see every project we cover in Chester.