Covering Ryde
We work in Ryde (PO33) and the places around it, including Gosport, Sandown and Portsmouth.
Because the Isle of Wight covers a wide area, we confirm availability after the first call and include any travel costs in the written quote rather than adding them later.
Homes in the South East
The South East has a lot of 1930s and post-war semi-detached housing, well suited to rear extensions and hip-to-gable loft conversions, alongside period properties in conservation areas that need a more careful design.
What does a loft conversion involve?
We start with the head height. You need roughly 2.2 m or more from the top of the ceiling joists to the underside of the ridge for a conversion to work without raising the roof. From there we design the staircase position, the type of conversion and the en-suite, and manage the whole build including fire safety and building control.
- Planning or lawful development certificate
- Dormer or rooflights, insulation and plasterboard
- En-suite, electrics, heating and fire safety upgrades
What is the guide price for a loft conversion in Ryde?
Use these ranges to budget for loft conversions; the survey turns them into a fixed price for the agreed specification.
| Loft conversions | Guide price incl. VAT |
|---|---|
| Rooflight conversion | £30,000 to £45,000 |
| Dormer conversion | £50,000 to £90,000 |
| Hip-to-gable with dormer | £60,000 to £95,000 |
| Mansard conversion | £65,000 to £110,000 |
How is a loft conversion approved in Ryde?
English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.
In England many loft conversions are permitted development: the extra roof volume must stay within 40 m³ on a terraced house or 50 m³ on a semi or detached house, nothing can sit higher than the existing ridge, no dormer can face a road on the main elevation, and side windows must be obscure-glazed and non-opening below 1.7 m. Houses in conservation areas, National Parks and National Landscapes cannot use these roof-extension rights, so dormers there need planning permission (a rooflight-only conversion can still be permitted development), and flats always need permission.
What should I think about before starting?
- Head height under the ridge decides whether a conversion is practical.
- Party wall notices are often needed for steels bearing on a shared wall.
What happens after I enquire?
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
Loft conversions: common questions
How long does a loft conversion take?
Usually 6 to 14 weeks on site depending on the type.
Do I need fire doors?
Often yes. Building regulations require a protected escape route from the new floor, which usually means fire doors on to the stairs and linked smoke alarms.
Who deals with the council for a project in Ryde?
We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.
Other towns nearby
- Loft conversions in Gosport
- Loft conversions in Sandown
- Loft conversions in Portsmouth
- Loft conversions in Newport
Learn more about loft conversions, or see every project we cover in Ryde.

