Covering Long Eaton
Alongside Long Eaton, we also cover Ilkeston, Nottingham (6 miles to the north-east) and West Bridgford.
Homes in the East Midlands
Housing in the East Midlands includes Victorian terraces, inter-war semis and newer estates, with stone-built villages in some areas where conservation controls apply.
What is a mansard loft conversion?
A mansard loft conversion replaces one or both slopes of a roof with a near-vertical wall, typically at 70 degrees, with small dormer windows set into it. It creates almost a full extra storey and is common on terraced houses in towns and cities, particularly in London.
- Roof removal and new mansard frame
- Staircase, insulation and fit-out
- En-suite, electrics and fire safety
How much should I budget for a mansard loft conversion?
Indicative costs for mansard loft conversions. London and the South East usually sit towards the top of each range.
| Mansard loft conversions | Guide price incl. VAT |
|---|---|
| Rear mansard | £65,000 to £85,000 |
| Front and rear (double) mansard | £80,000 to £110,000 |
Do you need permission for a mansard loft conversion in Long Eaton?
Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.
Mansard conversions change the shape of the roof significantly, so they usually need planning permission in England.
What can affect a mansard loft conversion?
- A mansard nearly always involves party walls on both sides of a terrace.
- Council design guides often require natural slate and lead.
What are the steps?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
Your questions answered
Does a mansard need planning permission?
Almost always, because it changes the roof profile.
How long does a mansard take?
Around 10 to 14 weeks on site after planning approval.
Do you work in Long Eaton?
Yes. Long Eaton is within our coverage for mansard loft conversions, along with nearby Ilkeston and Nottingham.
Mansard loft conversions in nearby towns
- Mansard loft conversions in Ilkeston
- Mansard loft conversions in Nottingham
- Mansard loft conversions in West Bridgford
- Mansard loft conversions in Heanor
Learn more about mansard loft conversions, or see every project we cover in Long Eaton.

