Covering Newry
Newry is about 27 miles west of Downpatrick. We also cover Banbridge (12 miles to the north), Keady and Portadown.
Homes in County Down
Northern Ireland has a high proportion of detached houses and bungalows outside the cities, which often suit side extensions, rear extensions and upward extensions.
What is a mansard loft conversion?
A mansard loft conversion replaces one or both slopes of a roof with a near-vertical wall, typically at 70 degrees, with small dormer windows set into it. It creates almost a full extra storey and is common on terraced houses in towns and cities, particularly in London.
- Planning and building control applications to the council
- Roof removal and new mansard frame
- Staircase, insulation and fit-out
How much should I budget for a mansard loft conversion?
What mansard loft conversions typically cost. These are guide ranges; the written quote for your house replaces them.
| Mansard loft conversions | Guide price incl. VAT |
|---|---|
| Rear mansard | £65,000 to £85,000 |
| Front and rear (double) mansard | £80,000 to £110,000 |
Do you need permission for a mansard loft conversion in Newry?
In Northern Ireland the council handles both planning and building control. Permitted development rules are set by the Planning (General Permitted Development) Order (Northern Ireland) 2015, and there is no party wall act, so we agree access and protection with neighbours in writing.
This needs full planning permission from the council in Northern Ireland, plus building control approval.
What can change the price or programme?
- The roof is open for longer than with a dormer, so weather protection matters.
- Council design guides often require natural slate and lead.
What happens after I enquire?
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
Mansard loft conversions: common questions
How long does a mansard take?
Around 10 to 14 weeks on site after planning approval.
Why choose a mansard over a dormer?
A mansard gives more usable space and often fits a street better where neighbours already have one.
Who deals with the council for a project in Newry?
We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.
Mansard loft conversions near Newry
- Mansard loft conversions in Banbridge
- Mansard loft conversions in Keady
- Mansard loft conversions in Portadown
- Mansard loft conversions in Armagh
Learn more about mansard loft conversions, or see every project we cover in Newry.

