New-build homes · Alloa

New-build homes in Alloa

New-build homes for homes in Alloa and the surrounding parts of the Forth Valley, designed around your house and built by our teams under a single written contract.

Covering Alloa

Our coverage around Alloa (FK10) also includes Stirling (6 miles to the west) and Grangemouth.

Homes in the Forth Valley

Housing in Scotland includes tenements in the cities, sandstone villas, inter-war and post-war semis and a large number of bungalows, which often suit dormer and upward extensions.

What do you get with a new-build home?

We can take a plot from feasibility through planning, detailed design, building regulations, construction and handover, or build to a design and planning permission you already have. The structure can be traditional masonry or timber frame, and we work to the energy and ventilation rules that apply to new homes in each nation.

  • Design, planning application and discharge of conditions
  • Superstructure, roof, windows and external finishes
  • Full internal fit-out and landscaping

What will a new-build home cost?

Use these ranges to budget for new-build homes; the survey turns them into a fixed price for the agreed specification.

New-build homesGuide price
Standard specification£2,000 to £2,500 per m²
Good specification£2,500 to £3,000 per m²
High specification£3,000 to £3,600 per m²

Planning and building rules in Alloa

In Scotland the key step is the building warrant, which must be granted before work begins. Planning permission is decided separately by the council, and work on shared walls is handled under your title deeds rather than a party wall act.

This needs planning permission and a building warrant from your council in Scotland before work starts.

What can change the price or programme?

  • Utility connections (water, sewer, power) can take months to arrange, so we apply early.
  • Planning conditions often need discharging before work starts.

What happens after I enquire?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
  3. Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

What people ask before starting

Can you help with planning on a plot?

Yes. We appraise the plot, prepare the design and submit the application.

How long does it take to build a house?

Usually 30 to 52 weeks on site, depending on size and method of construction.

Who deals with the council for a project in Alloa?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Also covering

Learn more about new-build homes, or see every project we cover in Alloa.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote