New-build homes · Bodmin

New-build homes in Bodmin

If you live in Bodmin and want new-build homes, we can take the whole job off your hands, from measuring the house to handing over a finished room.

Covering Bodmin

Bodmin sits 20 miles north-east of Truro, with St Austell 9 miles to the south and Launceston 20 miles to the north-east.

Because Cornwall covers a wide area, we confirm availability after the first call and include any travel costs in the written quote rather than adding them later.

Homes in the South West

Homes in the South West range from coastal and rural properties in stone and slate to city terraces and modern estates, so extensions are designed to match the local materials.

What is a new-build home?

We can take a plot from feasibility through planning, detailed design, building regulations, construction and handover, or build to a design and planning permission you already have. The structure can be traditional masonry or timber frame, and we work to the energy and ventilation rules that apply to new homes in each nation.

  • Plot appraisal and feasibility
  • Design, planning application and discharge of conditions
  • Building regulations design and warranty liaison

How much does a new-build home cost in Bodmin?

Indicative costs for new-build homes. London and the South East usually sit towards the top of each range.

New-build homesGuide price
Standard specification£2,000 to £2,500 per m²
Good specification£2,500 to £3,000 per m²
High specification£3,000 to £3,600 per m²

Do you need permission for a new-build home in Bodmin?

In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.

This needs full planning permission from the council. We prepare the drawings and supporting documents, submit the application and respond to the planning officer.

What should I think about before starting?

  • Utility connections (water, sewer, power) can take months to arrange, so we apply early.
  • Self-builders can usually reclaim VAT on certain materials through HMRC’s DIY housebuilders scheme where they buy them directly.

What happens after I enquire?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

What people ask before starting

How much does it cost to build a new house?

Typically £2,000 to £3,600 per square metre to build, depending on specification, ground conditions and design. New dwellings are usually zero-rated for VAT.

How long does it take to build a house?

Usually 30 to 52 weeks on site, depending on size and method of construction.

Can you visit a house in Bodmin to quote?

Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.

New-build homes near Bodmin

Learn more about new-build homes, or see every project we cover in Bodmin.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote