Covering Calne
Our coverage around Calne (SN11) also includes Chippenham (5 miles to the west) and Devizes.
Homes in the South West
Homes in the South West range from coastal and rural properties in stone and slate to city terraces and modern estates, so extensions are designed to match the local materials.
What goes into a new-build home?
A new-build home is a house built from the ground up on a plot, whether a one-off self-build for your family or a small group of homes. Building a new dwelling is usually zero-rated for VAT when carried out by a VAT-registered builder, which is a major cost difference from extensions and renovations.
- Plot appraisal and feasibility
- Groundworks, services and drainage connections
- Full internal fit-out and landscaping
What will a new-build home cost?
Typical ranges for new-build homes. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.
| New-build homes | Guide price |
|---|---|
| Standard specification | £2,000 to £2,500 per m² |
| Good specification | £2,500 to £3,000 per m² |
| High specification | £3,000 to £3,600 per m² |
Planning and building rules in Calne
Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.
This needs full planning permission from the council. We prepare the drawings and supporting documents, submit the application and respond to the planning officer.
What should I think about before starting?
- Utility connections (water, sewer, power) can take months to arrange, so we apply early.
- Planning conditions often need discharging before work starts.
What happens after I enquire?
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
New-build homes: common questions
How long does it take to build a house?
Usually 30 to 52 weeks on site, depending on size and method of construction.
Do I need a structural warranty?
If you need a mortgage or may sell within ten years, a structural warranty or professional consultant’s certificate is usually required.
Can you visit a house in Calne to quote?
Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.
Also covering
- New-build homes in Chippenham
- New-build homes in Devizes
- New-build homes in Corsham
- New-build homes in Trowbridge
Learn more about new-build homes, or see every project we cover in Calne.

