Covering Godalming
Our coverage around Godalming (GU7) also includes Guildford (4 miles to the north-east) and Aldershot.
Homes in the South East
Many South East homes are inter-war or post-war semis and detached houses with room for rear and side extensions, while historic town centres and villages bring conservation area and listed building controls.
What goes into a new-build home?
A new-build home is a house built from the ground up on a plot, whether a one-off self-build for your family or a small group of homes. Building a new dwelling is usually zero-rated for VAT when carried out by a VAT-registered builder, which is a major cost difference from extensions and renovations.
- Plot appraisal and feasibility
- Design, planning application and discharge of conditions
- Building regulations design and warranty liaison
What will a new-build home cost?
Guide prices for new-build homes, including VAT where it applies. Your fixed price is confirmed in writing after the survey.
| New-build homes | Guide price |
|---|---|
| Standard specification | £2,000 to £2,500 per m² |
| Good specification | £2,500 to £3,000 per m² |
| High specification | £3,000 to £3,600 per m² |
What approvals does a new-build home need in England?
Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.
This needs full planning permission from the council.
What can affect a new-build home?
- Utility connections (water, sewer, power) can take months to arrange, so we apply early.
- Most lenders want a structural warranty or architect’s certificate on a new home.
How does the project run?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
Your questions answered
How much does it cost to build a new house?
Typically £2,000 to £3,600 per square metre to build, depending on specification, ground conditions and design. New dwellings are usually zero-rated for VAT.
How long does it take to build a house?
Usually 30 to 52 weeks on site, depending on size and method of construction.
Do you work in Godalming?
Yes. Godalming is within our coverage for new-build homes, along with nearby Guildford and Aldershot.
New-build homes near Godalming
- New-build homes in Guildford
- New-build homes in Aldershot
- New-build homes in Farnham
- New-build homes in Woking
Learn more about new-build homes, or see every project we cover in Godalming.

