New-build homes · Gravesend

New-build homes in Gravesend

We take on new-build homes in Gravesend as a complete project: survey, drawings, planning or permitted development checks, building control and the construction itself.

Covering Gravesend

Gravesend is about 14 miles north-west of Maidstone. We also cover Grays (3 miles to the north-west), Strood and South Ockendon.

Homes in the South East

The South East has a lot of 1930s and post-war semi-detached housing, well suited to rear extensions and hip-to-gable loft conversions, alongside period properties in conservation areas that need a more careful design.

What does a new-build home involve?

A new-build home is a house built from the ground up on a plot, whether a one-off self-build for your family or a small group of homes. Building a new dwelling is usually zero-rated for VAT when carried out by a VAT-registered builder, which is a major cost difference from extensions and renovations.

  • Design, planning application and discharge of conditions
  • Building regulations design and warranty liaison
  • Full internal fit-out and landscaping

What is the guide price for a new-build home in Gravesend?

Use these ranges to budget for new-build homes; the survey turns them into a fixed price for the agreed specification.

New-build homesGuide price
Standard specification£2,000 to £2,500 per m²
Good specification£2,500 to £3,000 per m²
High specification£3,000 to £3,600 per m²

How is a new-build home approved in Gravesend?

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

This needs full planning permission from the council. We prepare the drawings and supporting documents, submit the application and respond to the planning officer.

What should Gravesend homeowners check first?

  • Self-builders can usually reclaim VAT on certain materials through HMRC’s DIY housebuilders scheme where they buy them directly.
  • Planning conditions often need discharging before work starts.

What happens after I enquire?

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

Your questions answered

How much does it cost to build a new house?

Typically £2,000 to £3,600 per square metre to build, depending on specification, ground conditions and design. New dwellings are usually zero-rated for VAT.

Can you help with planning on a plot?

Yes. We appraise the plot, prepare the design and submit the application.

Who deals with the council for a project in Gravesend?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Also covering

Learn more about new-build homes, or see every project we cover in Gravesend.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote