New-build homes · Hove

New-build homes in Hove

Our new-build homes service covers Hove and the rest of East Sussex. You get a fixed price in writing for the agreed specification, and one person co-ordinating the trades.

Covering Hove

We work in Hove (BN3) and the places around it, including Brighton, Rottingdean and Burgess Hill.

Homes in the South East

The South East has a lot of 1930s and post-war semi-detached housing, well suited to rear extensions and hip-to-gable loft conversions, alongside period properties in conservation areas that need a more careful design.

What does a new-build home involve?

We can take a plot from feasibility through planning, detailed design, building regulations, construction and handover, or build to a design and planning permission you already have. The structure can be traditional masonry or timber frame, and we work to the energy and ventilation rules that apply to new homes in each nation.

  • Plot appraisal and feasibility
  • Superstructure, roof, windows and external finishes
  • Full internal fit-out and landscaping

What will a new-build home cost?

Typical ranges for new-build homes. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.

New-build homesGuide price
Standard specification£2,000 to £2,500 per m²
Good specification£2,500 to £3,000 per m²
High specification£3,000 to £3,600 per m²

What approvals does a new-build home need in England?

English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.

This needs full planning permission from the council. We prepare the drawings and supporting documents, submit the application and respond to the planning officer.

What can affect a new-build home?

  • Utility connections (water, sewer, power) can take months to arrange, so we apply early.
  • Planning conditions often need discharging before work starts.

From first call to completion

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

New-build homes: common questions

Is VAT charged on building a new house?

Building a new dwelling is usually zero-rated when done by a VAT-registered builder. We confirm the position for your project.

How long does it take to build a house?

Usually 30 to 52 weeks on site, depending on size and method of construction.

Who deals with the council for a project in Hove?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

New-build homes in nearby towns

Learn more about new-build homes, or see every project we cover in Hove.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote