Covering Lincoln
We work in Lincoln (LN2) and the places around it, including Newark-on-Trent, Retford and Grantham.
Homes in the East Midlands
Housing in the East Midlands includes Victorian terraces, inter-war semis and newer estates, with stone-built villages in some areas where conservation controls apply.
What is a new-build home?
We can take a plot from feasibility through planning, detailed design, building regulations, construction and handover, or build to a design and planning permission you already have. The structure can be traditional masonry or timber frame, and we work to the energy and ventilation rules that apply to new homes in each nation.
- Design, planning application and discharge of conditions
- Groundworks, services and drainage connections
- Superstructure, roof, windows and external finishes
What is the guide price for a new-build home in Lincoln?
Indicative costs for new-build homes. London and the South East usually sit towards the top of each range.
| New-build homes | Guide price |
|---|---|
| Standard specification | £2,000 to £2,500 per m² |
| Good specification | £2,500 to £3,000 per m² |
| High specification | £3,000 to £3,600 per m² |
Planning and building rules in Lincoln
Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.
This needs full planning permission from the council. We prepare the drawings and supporting documents, submit the application and respond to the planning officer.
What can affect a new-build home?
- Utility connections (water, sewer, power) can take months to arrange, so we apply early.
- Most lenders want a structural warranty or architect’s certificate on a new home.
How does the project run?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
What people ask before starting
Is VAT charged on building a new house?
Building a new dwelling is usually zero-rated when done by a VAT-registered builder. We confirm the position for your project.
How long does it take to build a house?
Usually 30 to 52 weeks on site, depending on size and method of construction.
Can you visit a house in Lincoln to quote?
Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.
Also covering
- New-build homes in Newark-on-Trent
- New-build homes in Retford
- New-build homes in Grantham
- New-build homes in Worksop
Learn more about new-build homes, or see every project we cover in Lincoln.