Covering Renfrew
Alongside Renfrew, we also cover Clydebank, Paisley (3 miles to the south-west) and Bearsden.
Homes in Renfrewshire and Inverclyde
Housing in Scotland includes tenements in the cities, sandstone villas, inter-war and post-war semis and a large number of bungalows, which often suit dormer and upward extensions.
What is included in a new-build home in Renfrew?
A new-build home is a house built from the ground up on a plot, whether a one-off self-build for your family or a small group of homes. Building a new dwelling is usually zero-rated for VAT when carried out by a VAT-registered builder, which is a major cost difference from extensions and renovations.
- Building warrant application and completion certificate
- Plot appraisal and feasibility
- Groundworks, services and drainage connections
How much should I budget for a new-build home?
What new-build homes typically cost. These are guide ranges; the written quote for your house replaces them.
| New-build homes | Guide price |
|---|---|
| Standard specification | £2,000 to £2,500 per m² |
| Good specification | £2,500 to £3,000 per m² |
| High specification | £3,000 to £3,600 per m² |
Planning and building rules in Renfrew
In Scotland the key step is the building warrant, which must be granted before work begins. Planning permission is decided separately by the council, and work on shared walls is handled under your title deeds rather than a party wall act.
This needs planning permission and a building warrant from your council in Scotland before work starts.
What can change the price or programme?
- Utility connections (water, sewer, power) can take months to arrange, so we apply early.
- Planning conditions often need discharging before work starts.
How does the project run?
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
Your questions answered
How long does it take to build a house?
Usually 30 to 52 weeks on site, depending on size and method of construction.
Do I need a structural warranty?
If you need a mortgage or may sell within ten years, a structural warranty or professional consultant’s certificate is usually required.
Do you work in Renfrew?
Yes. Renfrew is within our coverage for new-build homes, along with nearby Clydebank and Paisley.
Also covering
- New-build homes in Clydebank
- New-build homes in Paisley
- New-build homes in Bearsden
- New-build homes in Bishopbriggs
Learn more about new-build homes, or see every project we cover in Renfrew.

