New-build homes · Stonehaven

New-build homes in Stonehaven

We take on new-build homes in Stonehaven as a complete project: survey, drawings, planning or permitted development checks, building control and the construction itself.

Covering Stonehaven

Stonehaven is about 13 miles south of Aberdeen. We also cover Banchory (12 miles to the north-west), Aberdeen and Montrose.

Homes in Aberdeen and Aberdeenshire

Housing in Scotland includes tenements in the cities, sandstone villas, inter-war and post-war semis and a large number of bungalows, which often suit dormer and upward extensions.

What does a new-build home involve?

A new-build home is a house built from the ground up on a plot, whether a one-off self-build for your family or a small group of homes. Building a new dwelling is usually zero-rated for VAT when carried out by a VAT-registered builder, which is a major cost difference from extensions and renovations.

  • Building warrant application and completion certificate
  • Building regulations design and warranty liaison
  • Groundworks, services and drainage connections

How much should I budget for a new-build home?

Guide prices for new-build homes, including VAT where it applies. Your fixed price is confirmed in writing after the survey.

New-build homesGuide price
Standard specification£2,000 to £2,500 per m²
Good specification£2,500 to £3,000 per m²
High specification£3,000 to £3,600 per m²

What approvals does a new-build home need in Scotland?

Projects in Scotland need a building warrant from the council before any building work starts, and a completion certificate once it is finished. Planning permission is a separate decision. The Party Wall etc. Act does not apply in Scotland; shared walls are governed by title deeds and the law of the tenement where relevant.

This needs planning permission and a building warrant from your council in Scotland before work starts. We prepare both applications.

What can affect a new-build home?

  • Utility connections (water, sewer, power) can take months to arrange, so we apply early.
  • Self-builders can usually reclaim VAT on certain materials through HMRC’s DIY housebuilders scheme where they buy them directly.

What happens after I enquire?

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

Questions about a new-build home in Stonehaven

How much does it cost to build a new house?

Typically £2,000 to £3,600 per square metre to build, depending on specification, ground conditions and design. New dwellings are usually zero-rated for VAT.

How long does it take to build a house?

Usually 30 to 52 weeks on site, depending on size and method of construction.

How do I get a price for new-build homes in Stonehaven?

Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.

New-build homes in nearby towns

Learn more about new-build homes, or see every project we cover in Stonehaven.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote