Covering West Bromwich
West Bromwich sits 5 miles north-west of Birmingham, with Smethwick 2 miles to the south-east and Tipton 3 miles to the west.
Homes in the West Midlands
The West Midlands has a large stock of 1930s semis and Victorian terraces in red brick, so matching brick and roof tiles is often the key to an extension that looks original.
What is a new-build home?
A new-build home is a house built from the ground up on a plot, whether a one-off self-build for your family or a small group of homes. Building a new dwelling is usually zero-rated for VAT when carried out by a VAT-registered builder, which is a major cost difference from extensions and renovations.
- Building regulations design and warranty liaison
- Groundworks, services and drainage connections
- Superstructure, roof, windows and external finishes
What will a new-build home cost?
Use these ranges to budget for new-build homes; the survey turns them into a fixed price for the agreed specification.
| New-build homes | Guide price |
|---|---|
| Standard specification | £2,000 to £2,500 per m² |
| Good specification | £2,500 to £3,000 per m² |
| High specification | £3,000 to £3,600 per m² |
How is a new-build home approved in West Bromwich?
English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.
This needs full planning permission from the council. We prepare the drawings and supporting documents, submit the application and respond to the planning officer.
What should I think about before starting?
- Most lenders want a structural warranty or architect’s certificate on a new home.
- Planning conditions often need discharging before work starts.
What happens after I enquire?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
What people ask before starting
Can you help with planning on a plot?
Yes. We appraise the plot, prepare the design and submit the application.
How long does it take to build a house?
Usually 30 to 52 weeks on site, depending on size and method of construction.
Who deals with the council for a project in West Bromwich?
We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.
New-build homes in nearby towns
- New-build homes in Smethwick
- New-build homes in Tipton
- New-build homes in Dudley
- New-build homes in Walsall
Learn more about new-build homes, or see every project we cover in West Bromwich.

