Covering Aberdeen and Aberdeenshire
We cover Aberdeen and Aberdeenshire, including Aberdeen, Peterhead, Inverurie and Fraserburgh, and the towns around them.
Homes in Aberdeen and Aberdeenshire
Housing in Scotland includes tenements in the cities, sandstone villas, inter-war and post-war semis and a large number of bungalows, which often suit dormer and upward extensions.
What does an orangery involve?
We build orangeries on proper foundations with insulated walls and roof perimeter, so they can be used all year as a dining room, sitting room or kitchen extension. The lantern size and the frame finish are chosen to suit the age and style of the house.
- Foundations, brick piers and insulated base
- Insulated roof perimeter with plastered pelmet
- Heating, electrics and decoration-ready finish
How much should I budget for an orangery?
Typical ranges for orangeries. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.
| Orangeries | Guide price incl. VAT |
|---|---|
| Standard specification | £3,000 to £3,500 per m² |
| Good specification | £3,500 to £4,100 per m² |
| High specification | £4,100 to £4,800 per m² |
Planning and building rules in Aberdeen and Aberdeenshire
Scottish projects follow a different process from England: the council issues a building warrant before work starts and accepts a completion certificate at the end, alongside any planning permission needed. We prepare both applications.
Scotland has its own householder permitted development rules, and small single-storey rear extensions are often covered.
What can affect an orangery?
- An orangery open to the house needs to meet energy rules, which limits the proportion of glazing.
- Timber-look aluminium or timber frames suit period houses.
What are the steps?
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
Questions about an orangery in Aberdeen and Aberdeenshire
Does an orangery need building regulations?
Usually yes, because it is built as part of the house rather than as a separated conservatory.
How long does it take to build?
About 8 to 14 weeks on site.
Do you work in Aberdeen and Aberdeenshire?
Yes. Aberdeen and Aberdeenshire is within our coverage for orangeries, along with nearby Aberdeen and Peterhead.
Orangeries near Aberdeen and Aberdeenshire
- Orangeries in Aberdeen
- Orangeries in Peterhead
- Orangeries in Inverurie
- Orangeries in Fraserburgh
- Orangeries in Stonehaven
- Orangeries in Banchory
Learn more about orangeries, or see every project we cover in Aberdeen and Aberdeenshire.

