Covering Blyth
Alongside Blyth, we also cover Bedlington, Ashington (4 miles to the north-west) and Cramlington.
Because Northumberland covers a wide area, we confirm availability after the first call and include any travel costs in the written quote rather than adding them later.
Homes in the North East
The North East has terraced housing including Tyneside flats, inter-war semis and post-war estates, so loft conversions, rear extensions and layout changes are popular ways to add space.
What is included in an orangery in Blyth?
We build orangeries on proper foundations with insulated walls and roof perimeter, so they can be used all year as a dining room, sitting room or kitchen extension. The lantern size and the frame finish are chosen to suit the age and style of the house.
- Planning or permitted development check
- Foundations, brick piers and insulated base
- Glazed roof lantern and windows or doors
How much does an orangery cost in Blyth?
Typical ranges for orangeries. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.
| Orangeries | Guide price incl. VAT |
|---|---|
| Standard specification | £3,000 to £3,500 per m² |
| Good specification | £3,500 to £4,100 per m² |
| High specification | £4,100 to £4,800 per m² |
Planning and building rules in Blyth
Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.
In England a single-storey rear extension can often go ahead under permitted development: up to 3 m deep on an attached house or 4 m on a detached one, no higher than 4 m, with eaves no higher than 3 m within 2 m of a boundary. Deeper extensions, up to 6 m or 8 m, need prior approval from the council first.
What should Blyth homeowners check first?
- An orangery open to the house needs to meet energy rules, which limits the proportion of glazing.
- Solar-control glass in the lantern stops summer overheating.
What are the steps?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
Your questions answered
Does an orangery need building regulations?
Usually yes, because it is built as part of the house rather than as a separated conservatory.
How long does it take to build?
About 8 to 14 weeks on site.
Do you work in Blyth?
Yes. Blyth is within our coverage for orangeries, along with nearby Bedlington and Ashington.
Also covering
Learn more about orangeries, or see every project we cover in Blyth.

