Orangeries · Coleraine

Orangeries in Coleraine

We take on orangeries in Coleraine as a complete project: survey, drawings, planning or permitted development checks, building control and the construction itself.

Covering Coleraine

Our coverage around Coleraine (BT51, BT52) also includes Portrush (4 miles to the north) and Ballymoney.

Homes in County Londonderry

Northern Ireland has a high proportion of detached houses and bungalows outside the cities, which often suit side extensions, rear extensions and upward extensions.

What do you get with an orangery?

An orangery is a single-storey extension with brick piers or walls, large windows and a glazed lantern set into a solid, insulated roof. It sits between a conservatory and a full extension: lighter than an extension, warmer and more solid than a conservatory.

  • Design to suit the house style
  • Planning or permitted development check
  • Heating, electrics and decoration-ready finish

What will an orangery cost?

Use these ranges to budget for orangeries; the survey turns them into a fixed price for the agreed specification.

OrangeriesGuide price incl. VAT
Standard specification£3,000 to £3,500 per m²
Good specification£3,500 to £4,100 per m²
High specification£4,100 to £4,800 per m²

How is an orangery approved in Coleraine?

Projects in Northern Ireland need planning clearance from one of the eleven councils and building control approval, also from the council. The Party Wall etc. Act does not extend to Northern Ireland, so work near neighbours is agreed directly and documented carefully.

In Northern Ireland permitted development is set by the Planning (General Permitted Development) Order (Northern Ireland) 2015, and small single-storey rear extensions can often go ahead without an application.

What can affect an orangery?

  • An orangery open to the house needs to meet energy rules, which limits the proportion of glazing.
  • Timber-look aluminium or timber frames suit period houses.

From first call to completion

  1. Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
  2. We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

Questions about an orangery in Coleraine

Does an orangery need building regulations?

Usually yes, because it is built as part of the house rather than as a separated conservatory.

How long does it take to build?

About 8 to 14 weeks on site.

Who deals with the council for a project in Coleraine?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Orangeries near Coleraine

Learn more about orangeries, or see every project we cover in Coleraine.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote