Orangeries · Dalkeith

Orangeries in Dalkeith

Our orangeries service covers Dalkeith and the rest of the Lothians. You get a fixed price in writing for the agreed specification, and one person co-ordinating the trades.

Covering Dalkeith

Our coverage around Dalkeith (EH22) also includes Bonnyrigg (2 miles to the south-west) and Musselburgh.

Homes in the Lothians

In Scotland many families extend bungalows and semis, while tenement flats bring shared ownership of roofs and walls that needs agreeing early.

What does an orangery involve?

We build orangeries on proper foundations with insulated walls and roof perimeter, so they can be used all year as a dining room, sitting room or kitchen extension. The lantern size and the frame finish are chosen to suit the age and style of the house.

  • Design to suit the house style
  • Glazed roof lantern and windows or doors
  • Heating, electrics and decoration-ready finish

What is the guide price for an orangery in Dalkeith?

Typical ranges for orangeries. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.

OrangeriesGuide price incl. VAT
Standard specification£3,000 to £3,500 per m²
Good specification£3,500 to £4,100 per m²
High specification£4,100 to £4,800 per m²

Planning and building rules in Dalkeith

Projects in Scotland need a building warrant from the council before any building work starts, and a completion certificate once it is finished. Planning permission is a separate decision. The Party Wall etc. Act does not apply in Scotland; shared walls are governed by title deeds and the law of the tenement where relevant.

Scotland has its own householder permitted development rules, and small single-storey rear extensions are often covered. Whatever the planning position, you need a building warrant from the council before any building work starts, and a completion certificate at the end.

What should Dalkeith homeowners check first?

  • An orangery open to the house needs to meet energy rules, which limits the proportion of glazing.
  • Heating should be part of the house system, not a plug-in heater.

What are the steps?

  1. Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
  2. Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

Your questions answered

How long does it take to build?

About 8 to 14 weeks on site.

Can it be used in winter?

Yes. It is insulated and heated like any other room.

Can you visit a house in Dalkeith to quote?

Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.

Orangeries in nearby towns

Learn more about orangeries, or see every project we cover in Dalkeith.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote