Orangeries · Dundee

Orangeries in Dundee

Orangeries in Dundee from SK Residential: design, approvals and the build handled under one contract, with one point of contact from the first visit to completion.

Covering Dundee

Alongside Dundee, we also cover Cupar (10 miles to the south), Carnoustie and St Andrews.

Homes in Dundee and Angus

Housing in Scotland includes tenements in the cities, sandstone villas, inter-war and post-war semis and a large number of bungalows, which often suit dormer and upward extensions.

What goes into an orangery?

We build orangeries on proper foundations with insulated walls and roof perimeter, so they can be used all year as a dining room, sitting room or kitchen extension. The lantern size and the frame finish are chosen to suit the age and style of the house.

  • Planning or permitted development check
  • Foundations, brick piers and insulated base
  • Heating, electrics and decoration-ready finish

How much should I budget for an orangery?

Typical ranges for orangeries. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.

OrangeriesGuide price incl. VAT
Standard specification£3,000 to £3,500 per m²
Good specification£3,500 to £4,100 per m²
High specification£4,100 to £4,800 per m²

Do you need permission for an orangery in Dundee?

Projects in Scotland need a building warrant from the council before any building work starts, and a completion certificate once it is finished. Planning permission is a separate decision. The Party Wall etc. Act does not apply in Scotland; shared walls are governed by title deeds and the law of the tenement where relevant.

Scotland has its own householder permitted development rules, and small single-storey rear extensions are often covered. Whatever the planning position, you need a building warrant from the council before any building work starts, and a completion certificate at the end.

What can change the price or programme?

  • An orangery open to the house needs to meet energy rules, which limits the proportion of glazing.
  • Heating should be part of the house system, not a plug-in heater.

How does the project run?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
  3. Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

Your questions answered

How long does it take to build?

About 8 to 14 weeks on site.

Can it be used in winter?

Yes. It is insulated and heated like any other room.

Who deals with the council for a project in Dundee?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Also covering

Learn more about orangeries, or see every project we cover in Dundee.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote