Orangeries · Dyfed

Orangeries in Dyfed

Our orangeries service covers Dyfed, from the larger towns to the villages around them, with design and build under one roof.

Covering Dyfed

Our coverage across Dyfed includes Llanelli, Ammanford, Aberystwyth and Carmarthen.

Homes in Dyfed

Across Wales you find valley terraces, coastal towns, rural stone houses and newer estates, so access, slopes and local materials all feature in the design.

What do you get with an orangery?

We build orangeries on proper foundations with insulated walls and roof perimeter, so they can be used all year as a dining room, sitting room or kitchen extension. The lantern size and the frame finish are chosen to suit the age and style of the house.

  • Planning and building regulations checks under Welsh rules
  • Design to suit the house style
  • Planning or permitted development check

What will an orangery cost?

Guide prices for orangeries, including VAT where it applies. Your fixed price is confirmed in writing after the survey.

OrangeriesGuide price incl. VAT
Standard specification£3,000 to £3,500 per m²
Good specification£3,500 to £4,100 per m²
High specification£4,100 to £4,800 per m²

Do you need permission for an orangery in Dyfed?

Welsh projects need planning clearance from the council under Welsh rules, building regulations approval under the Welsh approved documents, and party wall notices where the work affects a neighbour’s wall or foundations.

Wales has its own permitted development rules, set by the Welsh Government.

What can affect an orangery?

  • An orangery open to the house needs to meet energy rules, which limits the proportion of glazing.
  • Solar-control glass in the lantern stops summer overheating.

What are the steps?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

Orangeries: common questions

Does an orangery need building regulations?

Usually yes, because it is built as part of the house rather than as a separated conservatory.

How long does it take to build?

About 8 to 14 weeks on site.

Can you visit a house in Dyfed to quote?

Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.

Orangeries near Dyfed

Learn more about orangeries, or see every project we cover in Dyfed.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote