Covering Hexham
Our coverage around Hexham (NE46) also includes Consett, Newburn and Stanley.
Projects in Northumberland are taken on by arrangement, and any travel and accommodation costs for the team are shown openly in the quote.
Homes in the North East
In the North East, terraces, semis and bungalows all offer room to extend, with stone-built villages and conservation areas in parts of County Durham and Northumberland.
What is an orangery?
We build orangeries on proper foundations with insulated walls and roof perimeter, so they can be used all year as a dining room, sitting room or kitchen extension. The lantern size and the frame finish are chosen to suit the age and style of the house.
- Planning or permitted development check
- Foundations, brick piers and insulated base
- Insulated roof perimeter with plastered pelmet
How much does an orangery cost in Hexham?
Guide prices for orangeries, including VAT where it applies. Your fixed price is confirmed in writing after the survey.
| Orangeries | Guide price incl. VAT |
|---|---|
| Standard specification | £3,000 to £3,500 per m² |
| Good specification | £3,500 to £4,100 per m² |
| High specification | £4,100 to £4,800 per m² |
Do you need permission for an orangery in Hexham?
In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.
In England a single-storey rear extension can often go ahead under permitted development: up to 3 m deep on an attached house or 4 m on a detached one, no higher than 4 m, with eaves no higher than 3 m within 2 m of a boundary. Deeper extensions, up to 6 m or 8 m, need prior approval from the council first.
What should I think about before starting?
- Solar-control glass in the lantern stops summer overheating.
- Heating should be part of the house system, not a plug-in heater.
What happens after I enquire?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
Orangeries: common questions
Does an orangery need building regulations?
Usually yes, because it is built as part of the house rather than as a separated conservatory.
Can it be used in winter?
Yes. It is insulated and heated like any other room.
Who deals with the council for a project in Hexham?
We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.
Also covering
Learn more about orangeries, or see every project we cover in Hexham.

