Orangeries · Keady

Orangeries in Keady

Our orangeries service covers Keady and the rest of County Armagh. You get a fixed price in writing for the agreed specification, and one person co-ordinating the trades.

Covering Keady

Keady sits 7 miles south of Armagh, with Armagh 7 miles to the north and Newry 15 miles to the east.

Homes in County Armagh

Across Northern Ireland you find city terraces, suburban semis and rural bungalows and farmhouses, so the right approach depends on the plot and the planning history.

What do you get with an orangery?

We build orangeries on proper foundations with insulated walls and roof perimeter, so they can be used all year as a dining room, sitting room or kitchen extension. The lantern size and the frame finish are chosen to suit the age and style of the house.

  • Planning and building control applications to the council
  • Foundations, brick piers and insulated base
  • Glazed roof lantern and windows or doors

What will an orangery cost?

Typical ranges for orangeries. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.

OrangeriesGuide price incl. VAT
Standard specification£3,000 to £3,500 per m²
Good specification£3,500 to £4,100 per m²
High specification£4,100 to £4,800 per m²

Planning and building rules in Keady

Northern Ireland projects need planning clearance and building control approval from the local council. We prepare the applications and agree any work near neighbouring property directly with the neighbours.

In Northern Ireland permitted development is set by the Planning (General Permitted Development) Order (Northern Ireland) 2015, and small single-storey rear extensions can often go ahead without an application.

What can change the price or programme?

  • Timber-look aluminium or timber frames suit period houses.
  • Solar-control glass in the lantern stops summer overheating.

How does the project run?

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
  3. Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

Your questions answered

How long does it take to build?

About 8 to 14 weeks on site.

Can it be used in winter?

Yes. It is insulated and heated like any other room.

Can you visit a house in Keady to quote?

Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.

Orangeries in nearby towns

Learn more about orangeries, or see every project we cover in Keady.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote