Covering Newcastle upon Tyne
We work in Newcastle upon Tyne (NE1, NE98) and the places around it, including Gateshead, Gosforth and Felling.
Homes in the North East
In the North East, terraces, semis and bungalows all offer room to extend, with stone-built villages and conservation areas in parts of County Durham and Northumberland.
What is an orangery?
An orangery is a single-storey extension with brick piers or walls, large windows and a glazed lantern set into a solid, insulated roof. It sits between a conservatory and a full extension: lighter than an extension, warmer and more solid than a conservatory.
- Design to suit the house style
- Planning or permitted development check
- Foundations, brick piers and insulated base
What will an orangery cost?
Guide prices for orangeries, including VAT where it applies. Your fixed price is confirmed in writing after the survey.
| Orangeries | Guide price incl. VAT |
|---|---|
| Standard specification | £3,000 to £3,500 per m² |
| Good specification | £3,500 to £4,100 per m² |
| High specification | £4,100 to £4,800 per m² |
Planning and building rules in Newcastle upon Tyne
In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.
In England a single-storey rear extension can often go ahead under permitted development: up to 3 m deep on an attached house or 4 m on a detached one, no higher than 4 m, with eaves no higher than 3 m within 2 m of a boundary. Deeper extensions, up to 6 m or 8 m, need prior approval from the council first.
What can affect an orangery?
- Timber-look aluminium or timber frames suit period houses.
- Heating should be part of the house system, not a plug-in heater.
How does the project run?
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
Your questions answered
How long does it take to build?
About 8 to 14 weeks on site.
Can it be used in winter?
Yes. It is insulated and heated like any other room.
Do you work in Newcastle upon Tyne?
Yes. Newcastle upon Tyne is within our coverage for orangeries, along with nearby Gateshead and Gosforth.
Also covering
Learn more about orangeries, or see every project we cover in Newcastle upon Tyne.

