Covering Redruth
Redruth is about 8 miles west of Truro. We also cover Truro (8 miles to the east), Falmouth and Helston.
Because Cornwall covers a wide area, we confirm availability after the first call and include any travel costs in the written quote rather than adding them later.
Homes in the South West
Homes in the South West range from coastal and rural properties in stone and slate to city terraces and modern estates, so extensions are designed to match the local materials.
What goes into an orangery?
We build orangeries on proper foundations with insulated walls and roof perimeter, so they can be used all year as a dining room, sitting room or kitchen extension. The lantern size and the frame finish are chosen to suit the age and style of the house.
- Planning or permitted development check
- Foundations, brick piers and insulated base
- Heating, electrics and decoration-ready finish
How much should I budget for an orangery?
Indicative costs for orangeries. London and the South East usually sit towards the top of each range.
| Orangeries | Guide price incl. VAT |
|---|---|
| Standard specification | £3,000 to £3,500 per m² |
| Good specification | £3,500 to £4,100 per m² |
| High specification | £4,100 to £4,800 per m² |
Do you need permission for an orangery in Redruth?
In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.
In England a single-storey rear extension can often go ahead under permitted development: up to 3 m deep on an attached house or 4 m on a detached one, no higher than 4 m, with eaves no higher than 3 m within 2 m of a boundary.
What should Redruth homeowners check first?
- An orangery open to the house needs to meet energy rules, which limits the proportion of glazing.
- Heating should be part of the house system, not a plug-in heater.
From first call to completion
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
Your questions answered
Does an orangery need building regulations?
Usually yes, because it is built as part of the house rather than as a separated conservatory.
How long does it take to build?
About 8 to 14 weeks on site.
Do you work in Redruth?
Yes. Redruth is within our coverage for orangeries, along with nearby Truro and Falmouth.
Orangeries in nearby towns
Learn more about orangeries, or see every project we cover in Redruth.

