Orangeries · South Glamorgan

Orangeries in South Glamorgan

We design and build orangeries throughout South Glamorgan, with a fixed price in writing for the agreed specification and one point of contact.

Covering South Glamorgan

Our orangeries service in South Glamorgan covers Cardiff, Barry, Penarth and Llantwit Major and more.

Homes in South Glamorgan

Across Wales you find valley terraces, coastal towns, rural stone houses and newer estates, so access, slopes and local materials all feature in the design.

What is included in an orangery in South Glamorgan?

We build orangeries on proper foundations with insulated walls and roof perimeter, so they can be used all year as a dining room, sitting room or kitchen extension. The lantern size and the frame finish are chosen to suit the age and style of the house.

  • Planning and building regulations checks under Welsh rules
  • Planning or permitted development check
  • Insulated roof perimeter with plastered pelmet

What is the guide price for an orangery in South Glamorgan?

Use these ranges to budget for orangeries; the survey turns them into a fixed price for the agreed specification.

OrangeriesGuide price incl. VAT
Standard specification£3,000 to £3,500 per m²
Good specification£3,500 to £4,100 per m²
High specification£4,100 to £4,800 per m²

How is an orangery approved in South Glamorgan?

In Wales the planning rules, including what counts as permitted development, are set by the Welsh Government, and Welsh building regulations differ in places from England’s. We check both against your house before drawings are finalised, and handle party wall notices where needed.

Wales has its own permitted development rules, set by the Welsh Government.

What should I think about before starting?

  • An orangery open to the house needs to meet energy rules, which limits the proportion of glazing.
  • Timber-look aluminium or timber frames suit period houses.

What are the steps?

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

What people ask before starting

Does an orangery need building regulations?

Usually yes, because it is built as part of the house rather than as a separated conservatory.

How long does it take to build?

About 8 to 14 weeks on site.

Who deals with the council for a project in South Glamorgan?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Other towns nearby

Learn more about orangeries, or see every project we cover in South Glamorgan.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote