Covering Stoke-on-Trent
Our coverage around Stoke-on-Trent (ST4) also includes Newcastle-under-Lyme, Longton and Kidsgrove.
Homes in the West Midlands
Red-brick terraces and inter-war semis make up much of the housing in the West Midlands, which suits rear extensions, dormer lofts and hip-to-gable conversions, with more modern estates on the edges of the towns.
What does an orangery involve?
An orangery is a single-storey extension with brick piers or walls, large windows and a glazed lantern set into a solid, insulated roof. It sits between a conservatory and a full extension: lighter than an extension, warmer and more solid than a conservatory.
- Design to suit the house style
- Glazed roof lantern and windows or doors
- Heating, electrics and decoration-ready finish
How much should I budget for an orangery?
What orangeries typically cost. These are guide ranges; the written quote for your house replaces them.
| Orangeries | Guide price incl. VAT |
|---|---|
| Standard specification | £3,000 to £3,500 per m² |
| Good specification | £3,500 to £4,100 per m² |
| High specification | £4,100 to £4,800 per m² |
How is an orangery approved in Stoke-on-Trent?
English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.
In England a single-storey rear extension can often go ahead under permitted development: up to 3 m deep on an attached house or 4 m on a detached one, no higher than 4 m, with eaves no higher than 3 m within 2 m of a boundary. Deeper extensions, up to 6 m or 8 m, need prior approval from the council first.
What should Stoke-on-Trent homeowners check first?
- An orangery open to the house needs to meet energy rules, which limits the proportion of glazing.
- Timber-look aluminium or timber frames suit period houses.
From first call to completion
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
Your questions answered
How much does an orangery cost?
Typically £3,000 to £4,800 per square metre including VAT, or around £50,000 to £70,000 for a 16 m² orangery.
How long does it take to build?
About 8 to 14 weeks on site.
Who deals with the council for a project in Stoke-on-Trent?
We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.
Also covering
- Orangeries in Newcastle-under-Lyme
- Orangeries in Longton
- Orangeries in Kidsgrove
- Orangeries in Congleton
Learn more about orangeries, or see every project we cover in Stoke-on-Trent.

