Orangeries · Strabane

Orangeries in Strabane

If you live in Strabane and want orangeries, we can take the whole job off your hands, from measuring the house to handing over a finished room.

Covering Strabane

We work in Strabane (BT82) and the places around it, including Derry, Omagh and Limavady.

Homes in County Tyrone

Across Northern Ireland you find city terraces, suburban semis and rural bungalows and farmhouses, so the right approach depends on the plot and the planning history.

What is an orangery?

We build orangeries on proper foundations with insulated walls and roof perimeter, so they can be used all year as a dining room, sitting room or kitchen extension. The lantern size and the frame finish are chosen to suit the age and style of the house.

  • Design to suit the house style
  • Glazed roof lantern and windows or doors
  • Heating, electrics and decoration-ready finish

How much should I budget for an orangery?

Typical ranges for orangeries. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.

OrangeriesGuide price incl. VAT
Standard specification£3,000 to £3,500 per m²
Good specification£3,500 to £4,100 per m²
High specification£4,100 to £4,800 per m²

What approvals does an orangery need in Northern Ireland?

Northern Ireland projects need planning clearance and building control approval from the local council. We prepare the applications and agree any work near neighbouring property directly with the neighbours.

In Northern Ireland permitted development is set by the Planning (General Permitted Development) Order (Northern Ireland) 2015, and small single-storey rear extensions can often go ahead without an application. Building control approval from the council is still needed.

What can affect an orangery?

  • Timber-look aluminium or timber frames suit period houses.
  • Solar-control glass in the lantern stops summer overheating.

How does the project run?

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

What people ask before starting

Does an orangery need building regulations?

Usually yes, because it is built as part of the house rather than as a separated conservatory.

How long does it take to build?

About 8 to 14 weeks on site.

Who deals with the council for a project in Strabane?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Other towns nearby

Learn more about orangeries, or see every project we cover in Strabane.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote