Covering Magherafelt
Alongside Magherafelt, we also cover Cookstown, Ballymena (15 miles to the north-east) and Dungannon.
Homes in County Londonderry
Across Northern Ireland you find city terraces, suburban semis and rural bungalows and farmhouses, so the right approach depends on the plot and the planning history.
What do you get with a porch?
We build porches in matching brick with a tiled or lead roof, a new composite or timber door, and lighting. If you want a wider entrance or a WC, we can design a larger front extension instead and handle the planning.
- Planning and building control applications to the council
- Tiled, slate or lead roof
- Plastering and flooring ready finish
What will a porch cost?
Typical ranges for porches. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.
| Porches | Guide price incl. VAT |
|---|---|
| Open canopy over the door | £2,500 to £5,000 |
| Brick porch with tiled roof | £6,000 to £10,000 |
| Larger porch or front extension | £10,000 to £16,000 |
How is a porch approved in Magherafelt?
Projects in Northern Ireland need planning clearance from one of the eleven councils and building control approval, also from the council. The Party Wall etc. Act does not extend to Northern Ireland, so work near neighbours is agreed directly and documented carefully.
In Northern Ireland small porches are usually permitted development within size and position limits; larger ones need planning permission.
What should Magherafelt homeowners check first?
- Keeping the original front door between house and porch can keep a porch exempt from building regulations.
- Gas meters and drains near the front door may need relocating.
How does the project run?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
What people ask before starting
How long does it take?
One to three weeks on site.
Will the brick match?
We source the closest available match and agree it with you before building.
Who deals with the council for a project in Magherafelt?
We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.
Porches in nearby towns
Learn more about porches, or see every project we cover in Magherafelt.

