Covering The Scottish Borders
We cover the Scottish Borders, including Hawick, Galashiels, Peebles and Kelso, and the towns around them.
Projects in the Scottish Borders are taken on by arrangement, and any travel and accommodation costs for the team are shown openly in the quote.
Homes in the Scottish Borders
In Scotland many families extend bungalows and semis, while tenement flats bring shared ownership of roofs and walls that needs agreeing early.
What is included in a porch in the Scottish Borders?
A porch is a small enclosed entrance built in front of the front door, giving somewhere for coats and shoes and a buffer against draughts. Many porches are small enough to be built without a planning application.
- Building warrant application and completion certificate
- Front door and side window supply and fit
- Lighting and power
How much should I budget for a porch?
Use these ranges to budget for porches; the survey turns them into a fixed price for the agreed specification.
| Porches | Guide price incl. VAT |
|---|---|
| Open canopy over the door | £2,500 to £5,000 |
| Brick porch with tiled roof | £6,000 to £10,000 |
| Larger porch or front extension | £10,000 to £16,000 |
What approvals does a porch need in Scotland?
In Scotland the key step is the building warrant, which must be granted before work begins. Planning permission is decided separately by the council, and work on shared walls is handled under your title deeds rather than a party wall act.
In Scotland small porches can be permitted development within size and position limits.
What should I think about before starting?
- Gas meters and drains near the front door may need relocating.
- The roof pitch should echo the main roof or bay window.
From first call to completion
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
Your questions answered
How long does it take?
One to three weeks on site.
Will the brick match?
We source the closest available match and agree it with you before building.
Who deals with the council for a project in the Scottish Borders?
We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.
Also covering
Learn more about porches, or see every project we cover in The Scottish Borders.

