Re-roofing · Armagh

Re-roofing in Armagh

If you live in Armagh and want re-roofing, we can take the whole job off your hands, from measuring the house to handing over a finished room.

Covering Armagh

Our coverage around Armagh (BT60, BT61) also includes Keady, Portadown and Dungannon.

Homes in County Armagh

Northern Ireland has a high proportion of detached houses and bungalows outside the cities, which often suit side extensions, rear extensions and upward extensions.

What is re-roofing?

Re-roofing means stripping a pitched roof back to the rafters and replacing the membrane, battens, tiles or slates, ridge and flashings. It is needed when a roof covering reaches the end of its life, and it is the right time to improve loft insulation.

  • Scaffolding and edge protection
  • New tiles or slates, ridge and verge
  • Fascias, soffits and guttering if required

How much does re-roofing cost in Armagh?

What re-roofing typically cost. These are guide ranges; the written quote for your house replaces them.

Re-roofingGuide price incl. VAT
Terraced house£6,000 to £10,000
Semi-detached house£8,000 to £15,000
Detached house£12,000 to £25,000

Planning and building rules in Armagh

Northern Ireland projects need planning clearance and building control approval from the local council. We prepare the applications and agree any work near neighbouring property directly with the neighbours.

Like-for-like re-roofing does not usually need planning permission in Northern Ireland, except on listed buildings and in some conservation areas.

What should Armagh homeowners check first?

  • Neighbouring roofs on semis and terraces need careful junction details.
  • Bats can roost in roofs; if signs are found, work pauses for advice.

From first call to completion

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

Your questions answered

Do I need planning permission to re-roof?

Not usually for like-for-like replacement, unless the house is listed or in a conservation area with extra controls.

How long does it take?

One to three weeks for most houses, weather permitting.

Who deals with the council for a project in Armagh?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Re-roofing in nearby towns

Learn more about re-roofing, or see every project we cover in Armagh.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote