What is included in re-roofing in Bridgend?
We erect scaffolding, strip the old covering, check and repair the timbers, then lay a breathable membrane, new battens and the new covering, with dry-fix ridge and verge systems. Fascias, soffits and guttering can be replaced at the same time.
- Planning and building regulations checks under Welsh rules
- Breathable membrane and new battens
- New tiles or slates, ridge and verge
What is the guide price for re-roofing in Bridgend?
Use these ranges to budget for re-roofing; the survey turns them into a fixed price for the agreed specification.
| Re-roofing | Guide price incl. VAT |
|---|---|
| Terraced house | £6,000 to £10,000 |
| Semi-detached house | £8,000 to £15,000 |
| Detached house | £12,000 to £25,000 |
What approvals does re-roofing need in Wales?
In Wales the planning rules, including what counts as permitted development, are set by the Welsh Government, and Welsh building regulations differ in places from England’s. We check both against your house before drawings are finalised, and handle party wall notices where needed.
Like-for-like re-roofing does not usually need planning permission in Wales, except on listed buildings and in some conservation areas.
What can change the price or programme?
- Bats can roost in roofs; if signs are found, work pauses for advice.
- Insulation upgrades at the same time can cut heat loss significantly.
How does the project run?
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
What people ask before starting
Do I need planning permission to re-roof?
Not usually for like-for-like replacement, unless the house is listed or in a conservation area with extra controls.
How long does it take?
One to three weeks for most houses, weather permitting.
Do you work in Bridgend?
Yes. Bridgend is within our coverage for re-roofing, along with nearby Porthcawl and Cowbridge.