Re-roofing · Dunblane

Re-roofing in Dunblane

Planning re-roofing in Dunblane? We design and build them for houses across the Forth Valley, and we fix the price for the agreed specification in writing before any building work starts.

Covering Dunblane

Alongside Dunblane, we also cover Stirling, Alloa (8 miles to the south-east) and Auchterarder.

Homes in the Forth Valley

Housing in Scotland includes tenements in the cities, sandstone villas, inter-war and post-war semis and a large number of bungalows, which often suit dormer and upward extensions.

What do you get with re-roofing?

We erect scaffolding, strip the old covering, check and repair the timbers, then lay a breathable membrane, new battens and the new covering, with dry-fix ridge and verge systems. Fascias, soffits and guttering can be replaced at the same time.

  • Roof survey and quotation
  • Scaffolding and edge protection
  • Strip old covering and check timbers

How much should I budget for re-roofing?

Guide prices for re-roofing, including VAT where it applies. Your fixed price is confirmed in writing after the survey.

Re-roofingGuide price incl. VAT
Terraced house£6,000 to £10,000
Semi-detached house£8,000 to £15,000
Detached house£12,000 to £25,000

What approvals does re-roofing need in Scotland?

Scottish projects follow a different process from England: the council issues a building warrant before work starts and accepts a completion certificate at the end, alongside any planning permission needed. We prepare both applications.

Like-for-like re-roofing does not usually need planning permission in Scotland, except on listed buildings and in some conservation areas.

What can affect re-roofing?

  • Bats can roost in roofs; if signs are found, work pauses for advice.
  • Insulation upgrades at the same time can cut heat loss significantly.

How does the project run?

  1. Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
  2. Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

Your questions answered

How long does it take?

One to three weeks for most houses, weather permitting.

Should I replace the fascias at the same time?

Usually yes, because the scaffolding is already up.

Do you work in Dunblane?

Yes. Dunblane is within our coverage for re-roofing, along with nearby Stirling and Alloa.

Also covering

Learn more about re-roofing, or see every project we cover in Dunblane.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote