Covering Godalming
Alongside Godalming, we also cover Guildford, Aldershot (8 miles to the north-west) and Farnham.
Homes in the South East
Many South East homes are inter-war or post-war semis and detached houses with room for rear and side extensions, while historic town centres and villages bring conservation area and listed building controls.
What do you get with re-roofing?
We erect scaffolding, strip the old covering, check and repair the timbers, then lay a breathable membrane, new battens and the new covering, with dry-fix ridge and verge systems. Fascias, soffits and guttering can be replaced at the same time.
- Roof survey and quotation
- Breathable membrane and new battens
- Fascias, soffits and guttering if required
What is the guide price for re-roofing in Godalming?
What re-roofing typically cost. These are guide ranges; the written quote for your house replaces them.
| Re-roofing | Guide price incl. VAT |
|---|---|
| Terraced house | £6,000 to £10,000 |
| Semi-detached house | £8,000 to £15,000 |
| Detached house | £12,000 to £25,000 |
Do you need permission for re-roofing in Godalming?
Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.
Replacing a roof covering like for like does not usually need planning permission in England. Conservation areas with Article 4 directions and listed buildings are the exceptions.
What can affect re-roofing?
- Heavier tiles than the original can overload old rafters.
- Insulation upgrades at the same time can cut heat loss significantly.
From first call to completion
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
What people ask before starting
How long does it take?
One to three weeks for most houses, weather permitting.
Should I replace the fascias at the same time?
Usually yes, because the scaffolding is already up.
How do I get a price for re-roofing in Godalming?
Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.
Also covering
Learn more about re-roofing, or see every project we cover in Godalming.

