Re-roofing · Haddington

Re-roofing in Haddington

Re-roofing for homes in Haddington and the surrounding parts of the Lothians, designed around your house and built by our teams under a single written contract.

Covering Haddington

We work in Haddington (EH41) and the places around it, including Musselburgh, Dalkeith and Bonnyrigg.

Homes in the Lothians

In Scotland many families extend bungalows and semis, while tenement flats bring shared ownership of roofs and walls that needs agreeing early.

What goes into re-roofing?

Re-roofing means stripping a pitched roof back to the rafters and replacing the membrane, battens, tiles or slates, ridge and flashings. It is needed when a roof covering reaches the end of its life, and it is the right time to improve loft insulation.

  • Scaffolding and edge protection
  • Breathable membrane and new battens
  • New tiles or slates, ridge and verge

How much should I budget for re-roofing?

What re-roofing typically cost. These are guide ranges; the written quote for your house replaces them.

Re-roofingGuide price incl. VAT
Terraced house£6,000 to £10,000
Semi-detached house£8,000 to £15,000
Detached house£12,000 to £25,000

How is re-roofing approved in Haddington?

In Scotland the key step is the building warrant, which must be granted before work begins. Planning permission is decided separately by the council, and work on shared walls is handled under your title deeds rather than a party wall act.

Like-for-like re-roofing does not usually need planning permission in Scotland, except on listed buildings and in some conservation areas.

What should I think about before starting?

  • Heavier tiles than the original can overload old rafters.
  • Insulation upgrades at the same time can cut heat loss significantly.

What happens after I enquire?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
  3. Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

What people ask before starting

How much does a new roof cost?

Around £6,000 to £10,000 for a terraced house, £8,000 to £15,000 for a semi and £12,000 to £25,000 for a detached house, including VAT.

How long does it take?

One to three weeks for most houses, weather permitting.

Can you visit a house in Haddington to quote?

Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.

Re-roofing in nearby towns

Learn more about re-roofing, or see every project we cover in Haddington.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote