Covering Hamilton
Hamilton is about 6 miles east of East Kilbride. We also cover Motherwell (2 miles to the north-east), Wishaw and East Kilbride.
Homes in Lanarkshire
Scottish homes range from city tenements and sandstone terraces to bungalows and modern estates, and the building warrant process shapes the programme for every project.
What is re-roofing?
We erect scaffolding, strip the old covering, check and repair the timbers, then lay a breathable membrane, new battens and the new covering, with dry-fix ridge and verge systems. Fascias, soffits and guttering can be replaced at the same time.
- Building warrant application and completion certificate
- Strip old covering and check timbers
- New tiles or slates, ridge and verge
What will re-roofing cost?
Guide prices for re-roofing, including VAT where it applies. Your fixed price is confirmed in writing after the survey.
| Re-roofing | Guide price incl. VAT |
|---|---|
| Terraced house | £6,000 to £10,000 |
| Semi-detached house | £8,000 to £15,000 |
| Detached house | £12,000 to £25,000 |
Planning and building rules in Hamilton
Projects in Scotland need a building warrant from the council before any building work starts, and a completion certificate once it is finished. Planning permission is a separate decision. The Party Wall etc. Act does not apply in Scotland; shared walls are governed by title deeds and the law of the tenement where relevant.
Like-for-like re-roofing does not usually need planning permission in Scotland, except on listed buildings and in some conservation areas.
What can affect re-roofing?
- Neighbouring roofs on semis and terraces need careful junction details.
- Insulation upgrades at the same time can cut heat loss significantly.
From first call to completion
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
What people ask before starting
Do I need planning permission to re-roof?
Not usually for like-for-like replacement, unless the house is listed or in a conservation area with extra controls.
How long does it take?
One to three weeks for most houses, weather permitting.
Can you visit a house in Hamilton to quote?
Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.
Re-roofing near Hamilton
Learn more about re-roofing, or see every project we cover in Hamilton.

