Covering Isleworth
Our coverage around Isleworth (TW7) also includes Hounslow (1 miles to the south-west) and Heston.
Homes in London
London projects often mean working on period terraces with neighbours on both sides, tight access through the house and conservation area controls, so careful planning and party wall work matter as much as the build.
What does re-roofing involve?
Re-roofing means stripping a pitched roof back to the rafters and replacing the membrane, battens, tiles or slates, ridge and flashings. It is needed when a roof covering reaches the end of its life, and it is the right time to improve loft insulation.
- Roof survey and quotation
- New tiles or slates, ridge and verge
- Fascias, soffits and guttering if required
What will re-roofing cost?
Guide prices for re-roofing, including VAT where it applies. Your fixed price is confirmed in writing after the survey.
| Re-roofing | Guide price incl. VAT |
|---|---|
| Terraced house | £6,000 to £10,000 |
| Semi-detached house | £8,000 to £15,000 |
| Detached house | £12,000 to £25,000 |
Planning and building rules in Isleworth
English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.
Replacing a roof covering like for like does not usually need planning permission in England.
What can affect re-roofing?
- Heavier tiles than the original can overload old rafters.
- Neighbouring roofs on semis and terraces need careful junction details.
From first call to completion
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
Re-roofing: common questions
How long does it take?
One to three weeks for most houses, weather permitting.
Should I replace the fascias at the same time?
Usually yes, because the scaffolding is already up.
How do I get a price for re-roofing in Isleworth?
Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.
Other towns nearby
Learn more about re-roofing, or see every project we cover in Isleworth.

