What goes into re-roofing?
Re-roofing means stripping a pitched roof back to the rafters and replacing the membrane, battens, tiles or slates, ridge and flashings. It is needed when a roof covering reaches the end of its life, and it is the right time to improve loft insulation.
- Scaffolding and edge protection
- Breathable membrane and new battens
- New tiles or slates, ridge and verge
What will re-roofing cost?
Use these ranges to budget for re-roofing; the survey turns them into a fixed price for the agreed specification.
| Re-roofing | Guide price incl. VAT |
|---|---|
| Terraced house | £6,000 to £10,000 |
| Semi-detached house | £8,000 to £15,000 |
| Detached house | £12,000 to £25,000 |
Do you need permission for re-roofing in Lichfield?
In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.
Replacing a roof covering like for like does not usually need planning permission in England.
What should Lichfield homeowners check first?
- Neighbouring roofs on semis and terraces need careful junction details.
- Bats can roost in roofs; if signs are found, work pauses for advice.
How does the project run?
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
Re-roofing: common questions
Do I need planning permission to re-roof?
Not usually for like-for-like replacement, unless the house is listed or in a conservation area with extra controls.
How long does it take?
One to three weeks for most houses, weather permitting.
Who deals with the council for a project in Lichfield?
We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.