Covering Llangefni
Llangefni sits 8 miles north of Caernarfon, with Bangor 8 miles to the east and Caernarfon 8 miles to the south.
Homes in Gwynedd and Anglesey
Housing in Wales ranges from terraced streets in the valleys and older industrial towns to stone-built homes in rural areas and modern estates around the cities.
What is re-roofing?
Re-roofing means stripping a pitched roof back to the rafters and replacing the membrane, battens, tiles or slates, ridge and flashings. It is needed when a roof covering reaches the end of its life, and it is the right time to improve loft insulation.
- Roof survey and quotation
- Breathable membrane and new battens
- New tiles or slates, ridge and verge
What will re-roofing cost?
Guide prices for re-roofing, including VAT where it applies. Your fixed price is confirmed in writing after the survey.
| Re-roofing | Guide price incl. VAT |
|---|---|
| Terraced house | £6,000 to £10,000 |
| Semi-detached house | £8,000 to £15,000 |
| Detached house | £12,000 to £25,000 |
Planning and building rules in Llangefni
In Wales the planning rules, including what counts as permitted development, are set by the Welsh Government, and Welsh building regulations differ in places from England’s. We check both against your house before drawings are finalised, and handle party wall notices where needed.
Like-for-like re-roofing does not usually need planning permission in Wales, except on listed buildings and in some conservation areas.
What can affect re-roofing?
- Neighbouring roofs on semis and terraces need careful junction details.
- Bats can roost in roofs; if signs are found, work pauses for advice.
From first call to completion
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
Re-roofing: common questions
How long does it take?
One to three weeks for most houses, weather permitting.
Should I replace the fascias at the same time?
Usually yes, because the scaffolding is already up.
Who deals with the council for a project in Llangefni?
We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.
Other towns nearby
Learn more about re-roofing, or see every project we cover in Llangefni.

