Covering March
Our coverage around March (PE15) also includes Wisbech, Peterborough and King's Lynn.
Homes in the East of England
The East of England has a large stock of post-war and modern estate housing alongside period homes in market towns, which makes garage conversions, single-storey extensions and loft conversions popular.
What do you get with re-roofing?
We erect scaffolding, strip the old covering, check and repair the timbers, then lay a breathable membrane, new battens and the new covering, with dry-fix ridge and verge systems. Fascias, soffits and guttering can be replaced at the same time.
- Roof survey and quotation
- Scaffolding and edge protection
- Breathable membrane and new battens
What is the guide price for re-roofing in March?
Guide prices for re-roofing, including VAT where it applies. Your fixed price is confirmed in writing after the survey.
| Re-roofing | Guide price incl. VAT |
|---|---|
| Terraced house | £6,000 to £10,000 |
| Semi-detached house | £8,000 to £15,000 |
| Detached house | £12,000 to £25,000 |
Do you need permission for re-roofing in March?
Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.
Replacing a roof covering like for like does not usually need planning permission in England. Conservation areas with Article 4 directions and listed buildings are the exceptions.
What can affect re-roofing?
- Bats can roost in roofs; if signs are found, work pauses for advice.
- Insulation upgrades at the same time can cut heat loss significantly.
What are the steps?
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
Re-roofing: common questions
How long does it take?
One to three weeks for most houses, weather permitting.
Should I replace the fascias at the same time?
Usually yes, because the scaffolding is already up.
Who deals with the council for a project in March?
We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.
Also covering
Learn more about re-roofing, or see every project we cover in March.

