Covering Moray
Our re-roofing service in Moray covers Elgin, Forres, Buckie and Lossiemouth.
Projects in Moray are taken on by arrangement, and any travel and accommodation costs for the team are shown openly in the quote.
Homes in Moray
Scottish homes range from city tenements and sandstone terraces to bungalows and modern estates, and the building warrant process shapes the programme for every project.
What does re-roofing involve?
Re-roofing means stripping a pitched roof back to the rafters and replacing the membrane, battens, tiles or slates, ridge and flashings. It is needed when a roof covering reaches the end of its life, and it is the right time to improve loft insulation.
- Scaffolding and edge protection
- New tiles or slates, ridge and verge
- Fascias, soffits and guttering if required
How much does re-roofing cost in Moray?
What re-roofing typically cost. These are guide ranges; the written quote for your house replaces them.
| Re-roofing | Guide price incl. VAT |
|---|---|
| Terraced house | £6,000 to £10,000 |
| Semi-detached house | £8,000 to £15,000 |
| Detached house | £12,000 to £25,000 |
What approvals does re-roofing need in Scotland?
In Scotland the key step is the building warrant, which must be granted before work begins. Planning permission is decided separately by the council, and work on shared walls is handled under your title deeds rather than a party wall act.
Like-for-like re-roofing does not usually need planning permission in Scotland, except on listed buildings and in some conservation areas.
What can change the price or programme?
- Neighbouring roofs on semis and terraces need careful junction details.
- Bats can roost in roofs; if signs are found, work pauses for advice.
How does the project run?
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
What people ask before starting
How long does it take?
One to three weeks for most houses, weather permitting.
Should I replace the fascias at the same time?
Usually yes, because the scaffolding is already up.
Do you work in Moray?
Yes. Moray is within our coverage for re-roofing, along with nearby Elgin and Forres.
Re-roofing in nearby towns
Learn more about re-roofing, or see every project we cover in Moray.

