Covering Notting Hill
Alongside Notting Hill, we also cover Shepherd's Bush, Willesden (2 miles to the north-west) and Fulham.
Homes in London
London projects often mean working on period terraces with neighbours on both sides, tight access through the house and conservation area controls, so careful planning and party wall work matter as much as the build.
What is re-roofing?
We erect scaffolding, strip the old covering, check and repair the timbers, then lay a breathable membrane, new battens and the new covering, with dry-fix ridge and verge systems. Fascias, soffits and guttering can be replaced at the same time.
- Roof survey and quotation
- Breathable membrane and new battens
- New tiles or slates, ridge and verge
What is the guide price for re-roofing in Notting Hill?
Indicative costs for re-roofing. London and the South East usually sit towards the top of each range.
| Re-roofing | Guide price incl. VAT |
|---|---|
| Terraced house | £6,000 to £10,000 |
| Semi-detached house | £8,000 to £15,000 |
| Detached house | £12,000 to £25,000 |
Do you need permission for re-roofing in Notting Hill?
In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.
Replacing a roof covering like for like does not usually need planning permission in England.
What can affect re-roofing?
- Heavier tiles than the original can overload old rafters.
- Bats can roost in roofs; if signs are found, work pauses for advice.
What are the steps?
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
Questions about re-roofing in Notting Hill
Does re-roofing need building regulations?
In England and Wales, replacing a large part of the roof covering normally needs building control approval or a registered competent person, and insulation upgraded where practical.
How long does it take?
One to three weeks for most houses, weather permitting.
Who deals with the council for a project in Notting Hill?
We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.
Also covering
Learn more about re-roofing, or see every project we cover in Notting Hill.

