Covering Nottingham
Our coverage around Nottingham (NG1, NG3, NG7) also includes West Bridgford, Arnold and Hucknall.
Homes in the East Midlands
Across the East Midlands you find everything from city terraces to modern estates and stone villages, so the right extension depends a lot on the street and the materials around it.
What is included in re-roofing in Nottingham?
We erect scaffolding, strip the old covering, check and repair the timbers, then lay a breathable membrane, new battens and the new covering, with dry-fix ridge and verge systems. Fascias, soffits and guttering can be replaced at the same time.
- Roof survey and quotation
- Scaffolding and edge protection
- New tiles or slates, ridge and verge
How much does re-roofing cost in Nottingham?
Indicative costs for re-roofing. London and the South East usually sit towards the top of each range.
| Re-roofing | Guide price incl. VAT |
|---|---|
| Terraced house | £6,000 to £10,000 |
| Semi-detached house | £8,000 to £15,000 |
| Detached house | £12,000 to £25,000 |
What approvals does re-roofing need in England?
Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.
Replacing a roof covering like for like does not usually need planning permission in England. Conservation areas with Article 4 directions and listed buildings are the exceptions.
What can affect re-roofing?
- Neighbouring roofs on semis and terraces need careful junction details.
- Insulation upgrades at the same time can cut heat loss significantly.
From first call to completion
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
Questions about re-roofing in Nottingham
Do I need planning permission to re-roof?
Not usually for like-for-like replacement, unless the house is listed or in a conservation area with extra controls.
How long does it take?
One to three weeks for most houses, weather permitting.
Do you work in Nottingham?
Yes. Nottingham is within our coverage for re-roofing, along with nearby West Bridgford and Arnold.
Also covering
Learn more about re-roofing, or see every project we cover in Nottingham.

